diff options
author | Paul Turner <pjt@google.com> | 2011-07-21 09:43:27 -0700 |
---|---|---|
committer | Ingo Molnar <mingo@elte.hu> | 2011-08-14 12:01:13 +0200 |
commit | 953bfcd10e6f3697233e8e5128c611d275da39c1 (patch) | |
tree | a3ca8136bb9e992bb40945c5eee2a8dcc0fd0b57 /tools | |
parent | 5710f15b52664ae0bfa60a66d75464769d297b2b (diff) | |
download | linux-stable-953bfcd10e6f3697233e8e5128c611d275da39c1.tar.gz linux-stable-953bfcd10e6f3697233e8e5128c611d275da39c1.tar.bz2 linux-stable-953bfcd10e6f3697233e8e5128c611d275da39c1.zip |
sched: Implement hierarchical task accounting for SCHED_OTHER
Introduce hierarchical task accounting for the group scheduling case in CFS, as
well as promoting the responsibility for maintaining rq->nr_running to the
scheduling classes.
The primary motivation for this is that with scheduling classes supporting
bandwidth throttling it is possible for entities participating in throttled
sub-trees to not have root visible changes in rq->nr_running across activate
and de-activate operations. This in turn leads to incorrect idle and
weight-per-task load balance decisions.
This also allows us to make a small fixlet to the fastpath in pick_next_task()
under group scheduling.
Note: this issue also exists with the existing sched_rt throttling mechanism.
This patch does not address that.
Signed-off-by: Paul Turner <pjt@google.com>
Reviewed-by: Hidetoshi Seto <seto.hidetoshi@jp.fujitsu.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Link: http://lkml.kernel.org/r/20110721184756.878333391@google.com
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Diffstat (limited to 'tools')
0 files changed, 0 insertions, 0 deletions