summaryrefslogtreecommitdiffstats
path: root/include/drm/drm_bridge.h
diff options
context:
space:
mode:
Diffstat (limited to 'include/drm/drm_bridge.h')
-rw-r--r--include/drm/drm_bridge.h8
1 files changed, 4 insertions, 4 deletions
diff --git a/include/drm/drm_bridge.h b/include/drm/drm_bridge.h
index 435be20029f7..d3ca16f4da8f 100644
--- a/include/drm/drm_bridge.h
+++ b/include/drm/drm_bridge.h
@@ -98,7 +98,7 @@ struct drm_bridge_funcs {
* preceding element is a bridge this means it's called before that
* bridge's ->disable() function. If the preceding element is a
* &drm_encoder it's called right before the encoder's ->disable(),
- * ->prepare() or ->dpms() hook from struct &drm_encoder_helper_funcs.
+ * ->prepare() or ->dpms() hook from &struct drm_encoder_helper_funcs.
*
* The bridge can assume that the display pipe (i.e. clocks and timing
* signals) feeding it is still running when this callback is called.
@@ -115,7 +115,7 @@ struct drm_bridge_funcs {
* preceding element is a bridge this means it's called after that
* bridge's ->post_disable() function. If the preceding element is a
* &drm_encoder it's called right after the encoder's ->disable(),
- * ->prepare() or ->dpms() hook from struct &drm_encoder_helper_funcs.
+ * ->prepare() or ->dpms() hook from &struct drm_encoder_helper_funcs.
*
* The bridge must assume that the display pipe (i.e. clocks and timing
* singals) feeding it is no longer running when this callback is
@@ -144,7 +144,7 @@ struct drm_bridge_funcs {
* preceding element is a bridge this means it's called before that
* bridge's ->pre_enable() function. If the preceding element is a
* &drm_encoder it's called right before the encoder's ->enable(),
- * ->commit() or ->dpms() hook from struct &drm_encoder_helper_funcs.
+ * ->commit() or ->dpms() hook from &struct drm_encoder_helper_funcs.
*
* The display pipe (i.e. clocks and timing signals) feeding this bridge
* will not yet be running when this callback is called. The bridge must
@@ -163,7 +163,7 @@ struct drm_bridge_funcs {
* preceding element is a bridge this means it's called after that
* bridge's ->enable() function. If the preceding element is a
* &drm_encoder it's called right after the encoder's ->enable(),
- * ->commit() or ->dpms() hook from struct &drm_encoder_helper_funcs.
+ * ->commit() or ->dpms() hook from &struct drm_encoder_helper_funcs.
*
* The bridge can assume that the display pipe (i.e. clocks and timing
* signals) feeding it is running when this callback is called. This